circuitnet
Sponsor
Advanced Interconnections Corp.
Plan Ahead for BGA Device Upgrades
BGA Socket Adapter Systems convert surface mount device packages to through-hole (pinned) assemblies, making it easy to plug and unplug SMT devices in the field or the test lab.
Advanced Interconnections Corp.
Rentals and Rent to Purchase x-ray Systems
Sponsor
ECD
Maybe it's the thermocouple connection
If your thermal profiling readings seem inconsistent, the culprit could be your thermocouple attachment method. A recently conducted study revealed some interesting findings.
ECD

Electrical Test Conditions & Considerations



Electrical Test Conditions & Considerations
When an OEM is deciding requirements for a particular part regarding Electrical Test, some over precautions and disconnects may occur.

DOWNLOAD
Authored By:
Rick Meraw (Primary Author), Senior VP USA Operations
Todd Kolmodin (Co-Author), Vice President Quality North America
Gardien Services USA Inc
Forest Grove, Oregon USA

Summary

The PCB industry is ever changing and adapting to new technology. OEM specifications and requirements have also advanced due to these technologies. With these advancements some things will still remain the same and some requirements will change.

PCB manufactures are told what electrical test requirements are necessary for a given particular part via a FAB (Master) drawing. This is usually done during the "quoting" or "procurement" phase. When an OEM is deciding what requirements are required for a particular part regarding Electrical Test, some over precautions and/or disconnects may occur.

Conclusions

When testing PCBs it can be quite confusing as to what method to use, parameters are necessary for the Performance Class and what cost to associate in the build to way against the long term reliability of the product. Design anomalies and capacitive cores can further cause stress in the once thought streamlined process.

Understanding how the machines and methods test the product up front may alleviate delays and unnecessary waste in what otherwise would have been conforming product and delivered on-time. From the OEM side the better understanding of how the methods and parameters work against the product can better inform the manufacturer of possible anomalies in the final inspection process. If these are communicated up front, unnecessary delays can be omitted.

Initially Published in the IPC Proceedings
Submit A Comment
Comments are reviewed prior to posting. You must include your full name to have your comments posted. We will not post your email address.

Your Name


Your Company
Your E-mail


Your Country
Your Comments



Free Newsletter Subscription
Circuitnet is built for professionals who bear the responsibility of looking ahead, imagining the future, and preparing for it.

Insert Your Email Address

Sponsor
Uyemura
RAIG Minimizes Corrosion, Allows Higher Gold on ENEPIG
Paper describes a mixed reaction RAIG electrolyte that minimizes galvanic corrosion and allows higher ENEPIG gold thicknesses, enabling robust designs and world-class quality on target with minimal variation.
Uyemura
Affordable Profiling