| Industry Paper |
Extending the Golden Hour in the SMT Assembly Line
The first hour after a traumatic injury is called the "Golden Hour" and considered by trauma surgeons to be the most critical time for successful treatment. Although, different from a life or death situation, it is similar in an SMT assembly line where a few minutes of downtime can cost millions of dollars, so the Golden Hour concept does exist in the SMT production process.
Koh Young Technology Inc.
|
Complete the form below to download this technical paper.
|
Free Newsletter Subscription
Circuitnet is built for professionals who bear the responsibility of looking ahead, imagining the future, and preparing for it.
Insert Your Email Address
|
|
Sponsor
|
|
Oxide Reduction for Reliable Electronics Manufacturing
As power densities increase and components become smaller, oxide layers and surface contamination become critical manufacturing risks. Discover practical approaches for oxide reduction, cleaning and activation in electronics production. Download the whitepaper.
Plasmatreat GmbH
|
|
|