Solder Defects and Continuous Improvement
Board Talk
TranscriptPhil
Jim Phil
Well it is broken, damn it. This whole thing flies in the face of what you and Dr. Ron and I are always talking about, LEAN and continuous improvement. This is the opposite; I don't get it. I mean people are actually maintaining inventory in preparation for building scrap. This is insane. How did we evolve to this? Where did this come from?
Jim I think one of the problems is they don't want to know; they don't want to deal with DPMO, defects per million opportunities, percent first pass yield. They're taking first yield after you do touch-up. All these things contribute. I think it's just hiding a problem. Phil We have something we call the consultant's dilemma. To paraphrase our Car Talk Brothers, but basically we feel like we're mechanics. One of the things we have in common with them. This is what we typically see. People have a defect problem: "Maybe if I ignore it it'll go away," like putting duct tape over the Check Engine light or turning the radio up to hide a sound. Then they go a little further: now it's starting to get a little bit more severe, kind of swerving from side to side, hitting the curb, things like that: "Well, let's try to fix it ourselves," oh, finally getting to do something. Sometimes they succeed; a lot of the times they don't, and it gets worse. And then maybe they'll call in the consultant.
But anyway, it's that first thing, that complacency, where they're living with a certain level of defects. How do we get this way? Is this an indictment of our society and our whole culture? Jim Phil All right, I'll calm down now. Jim And speaking of soldering. Don't solder like my brother. Phil
Jim Comments
Nov 6, 2016
It's all about the resources. Some times your designs are not supported by your equipment. You do the best you can with what you have. It would be great to live in the world of no limits, but it is not so.
Dan Fettner
Oct 30, 2013
Solder defects on others words is lack of process knowledge and control of the input critical characteristics KIV, and of couse following the internal procedures, as Jerry Maguire said on the movie Show me the money (show me the data ) and I can make Improvement.
Juan Olivares, COTO Technology, Mexico
Jan 10, 2011
I think there are several factors that may be at work here. There may be a cultural factor, which was eluded to in the piece. There may be a resource factor, not enough expertise to go around.
However, we shouldn't overlook the "continuous advance of component technology factor". As we become comfortable with 0402's, and micro-BGA's, here come 1005's, QFN's, and .075 pitch through hole arrays, etc, etc. As component technology advances, a complete re-engineering of processes may be required to keep defects under control. So, at least from my perspective, the advance in component technology is the most critical factor promoting soldering defects today.
K.D., Zhone Technologies
Jul 13, 2010
I think it's companies who set themselves up to get mediocre results in manufacturing. They lean up their workforce so much that it's impossible for the engineering staff to manage it all.
I'm the Process Engineer for 5 SMT lines, which have 6 pick and place machines, 5 ovens, 5 printers. On top of that, I'm also the guy for our through hole dept which includes 4 selective soldering machines, component prep, wash, and hand soldering. I have an Engineer who is just now taking over the printing process and data collection for the SMT area, and an Engineering Tech who helps in both areas. I have DFM projects constantly, ongoing process validation, new process investigation, RoHS, REACH, and a slew of other things like that that have my constant attention. Now, don't get me wrong, I know I have tremendous job security, but in reality, it's more work than 3 people can do so things slip. We hit the major defects, not the spikes mind you, but the consistent, lower hanging fruit that does "weekly or daily" damage. When I worked for HP (pre-Agilent), they had an Engineer and Tech for every SMT and Through Hole process. They might be an example of what having "Fat Engineering Resources" was, but defects were very low and continuous improvement was very obvious and focused on. I think it boils down to the resources your company can commit, in other words: You get what you ultimately pay for.
T.H.
|
||||||||
|